IED Baseline Report

RWE Power AG

 

 

Our services

Preparation of Baseline Report for Lignite-fired power plant (7 units, 4.465 MW Power) according to industrial emission directive (IED)

  • Inspection of all installations
  • Evaluation of the available documents
  • Evaluation of the relevant substances
  • Examination of the necessity for the preparation of a baseline report
  • Development of an investigation concept
  • Carrying out the investigations on site
  • Preparation of the baseline report
  • Coordination with the competent authorities