IED Baseline Report
RWE Power AG
Our services
Preparation of Baseline Report for Lignite-fired power plant (7 units, 4.465 MW Power) according to industrial emission directive (IED)
- Inspection of all installations
- Evaluation of the available documents
- Evaluation of the relevant substances
- Examination of the necessity for the preparation of a baseline report
- Development of an investigation concept
- Carrying out the investigations on site
- Preparation of the baseline report
- Coordination with the competent authorities
Photos: Adobe Stock #17787872, Picturenick; #16478316, Turbowerner