Baseline Report
Befesa Zinc Duisburg GmbH I Duisburg
Our services
Preparation of a Baseline Report in accordance with the Industrial Emissions Directive (IED) for Befesa Zinc Duisburg GmbH
- Preliminary studies
- Evaluation of documentation (former investigations, site history)
- Evaluation of relevant hazardous substances
- Description of areas for storage and handling of hazardous substances
- Preparation of a concept for soil and groundwater investigation
- Conducting soil and groundwater investigations
- Preparation of the Baseline Report
- Coordination with the authorities

